Heading Line

Top  Previous  Next

Where a large schedule exists, it is sometimes easier to split the schedule into several sections through the use of Heading Lines.

 

Inserting a Heading Line

 

1.Highlight the appropriate schedule from the Site List and select "Schedule Schedule For" from the Side Bar.
2.Toggle Edit Mode to ON.
3.Click on the asset above which the Heading line is to be placed, and insert a new item.  Either:
click on the Insert item icon from the Tool Bar, or
right-click in the Data Area and select "Insert item Insert Item" from the subsequent menu.

(HINT: If the Insert Item icon is greyed-out, then either:

Edit Mode has not been selected, or
the login account in use does not have the authority to insert an item).
4.Change the new line to a Heading Line.  Either:
right-click on the appropriate item and select "Heading Line Convert to Heading Line" from the subsequent menu, or
ensure the new (blank) line is highlighted and click the Heading Line icon (Convert to Heading Line) from the Tool Bar.
5.In the "Warning" dialog box, select Yes to convert the asset to a Heading Line, or No to abandon the conversion.
6.To insert a title, click into the Item Description Field and input the required text.
7.Click the Save icon to save the changes.

       

Converting an existing asset to a Heading Line

 

(NOTE: Converting an asset to a Heading Line will clear all the fields except for the Item Description.  Once changes are saved to the database it will be impossible to re-instate overwritten data).

 

1.Highlight the appropriate schedule from the Site List and select "Schedule Schedule For" from the Side Bar.
2.Toggle Edit Mode to ON.
3.Click on the asset which is to be converted to a Heading Line.
4.Change the asset to a Heading Line.  Either:
right-click on the appropriate item and select "Heading Line Convert to Heading Line" from the subsequent menu, or
ensure the new (blank) line is highlighted and click the Heading Line icon (Convert to Heading Line) from the Tool Bar.
5.In the "Warning" dialog box, select Yes to convert the asset to a Heading Line, or No to abandon the conversion.
6.Amend the Item Description field if required.
7.Click the Save icon to save the changes.

 

Reverting a Heading line to a Normal asset

 

1.Select the required Heading Line.
2.Toggle Edit Mode to ON.
3.Either:
right-click on the appropriate item and select "Normal Line Convert to Normal Line" from the subsequent menu, or
ensure the appropriate line is highlighted and click the Normal Line icon (Convert to Normal Line) from the Tool Bar.