Inspections Due

Top  Previous  Next

A listing of planned inspections can be generated via the Inspections Due screen:

 

1.From the Site List, select the Scheme, Building or Module for which an Inspections Due listing is required.
2.Select "Inspections due Inspections Due For" from the Side Bar.
3.By default, a list showing all Thorough or Working inspections planned for one month (beginning on the Sunday of the current week) will be displayed:

 

       inspdue1

 

The report can be amended to take into account the following criteria:

 

Inspection Type – Thorough or Working, Thorough, Working.
Method of Operation - Planned Date or Due Date of inspection.
Time Scale – One Month or One Week.
Start Date – select the required date from the drop-down calendar. (NOTE: The date may be either retrospective or in the future).

 

To change these criteria, click on the appropriate option listed above the Grouping Area and select the required criterion.  Once all changes have been made, click Update List to refresh the view of the screen.