Initially, inspection dates need to be fed into the planning process via the Item Details screen of the required asset:
| 1. | Highlight the appropriate schedule from the Site List and select " Schedule For" from the Side Bar. |
| 2. | Double-click on the asset for which an inspection is to be planned (to open the relevant Item Details page). |
| 3. | Toggle Edit Mode to ON. |
| 4. | Click into the Planned Date Thorough field and pick the planned date of inspection from the drop-down calendar. (NOTE: Where the Due Date Thorough field has been completed, the Planned Date can be set no later than the Due Date). |
| 5. | Click into the Planned Date Working field and repeat the process. (NOTE: Again, where a Due Date Working has been set, the Planned Date of the working inspection can be no later than the Due Date). |
| 6. | Click to save the changes. |
Once the initial dates have been input, it is possible to amend them either via the Item Details screen (simply by changing the date from the drop-down calendar in the appropriate field) or via the Inspection Planning screen. (NOTE: The Planned Date of inspection can be no later than the Due Date of inspection):
| 1. | Highlight the appropriate schedule from the Site List and select " Schedule For" from the Side Bar. |
| 2. | Click on the asset for which the planned inspection dates are to be edited. |
| 3. | Select " Insp. Planning For" from the Side Bar. |
| 4. | Toggle Edit Mode to ON. |
| 5. | Right-click on the arrowhead icon of the inspection to be re-planned. |
| 6. | A drop-down calendar will open. |
| 7. | Select the new date (scrolling through the calendar as required). |
| 8. | Click OK to change the date of inspection, or Cancel to abandon the process. |
| 9. | Save the changes by clicking the icon. |
|